Review and retention — daily recall for reps

Do not reread the whole guide when you need retention. Cover a few high-risk prompts, answer from memory, then reveal and correct.

Active recall

Daily 3 — field recall

01Oil decommissioning now always includes which two line items?

Full oil tank removal plus an electric water heater swap. The tank leaves the premises; drain-only is gone.

Review the source →
02When can NYSERDA / EFS be used?

Only on qualifying decommissioning jobs through Con Edison Clean Heat. Non-decommissioning jobs cannot use NYSERDA / EFS.

Review the source →
03What payment baseline should the 30-minute close use?

The homeowner’s full-year gas or oil bill divided by 12, not a winter-only number.

Review the source →
Active recall

Monthly pitfalls — change-order prevention

01What is the Yonkers solar inspection stop condition?

If solar is pending inspection, HVAC permits must be pulled before install or violations can start at $8,000.

Review the source →
02What refrigerant condition blocks keeping existing units on decommissioning?

Existing 410A units must be replaced even if functional; R32 units can be kept and registered if recently installed.

Review the source →
03What rooms must be covered for Con Edison approval?

Any room with a door and a bed needs a unit unless the bed is removed or covered to show non-sleeping use.

Review the source →