Review and retention — daily recall for reps
Do not reread the whole guide when you need retention. Cover a few high-risk prompts, answer from memory, then reveal and correct.
Daily 3 — field recall
01Oil decommissioning now always includes which two line items?
Full oil tank removal plus an electric water heater swap. The tank leaves the premises; drain-only is gone.
Review the source →02When can NYSERDA / EFS be used?
Only on qualifying decommissioning jobs through Con Edison Clean Heat. Non-decommissioning jobs cannot use NYSERDA / EFS.
Review the source →03What payment baseline should the 30-minute close use?
The homeowner’s full-year gas or oil bill divided by 12, not a winter-only number.
Review the source →Monthly pitfalls — change-order prevention
01What is the Yonkers solar inspection stop condition?
If solar is pending inspection, HVAC permits must be pulled before install or violations can start at $8,000.
Review the source →02What refrigerant condition blocks keeping existing units on decommissioning?
Existing 410A units must be replaced even if functional; R32 units can be kept and registered if recently installed.
Review the source →03What rooms must be covered for Con Edison approval?
Any room with a door and a bed needs a unit unless the bed is removed or covered to show non-sleeping use.